Piping Fabrication, Field Welding & Test Package Movement
We provide end-to-end piping fabrication, field welding, installation, inspection, and commissioning services for industrial projects. Our execution process includes material identification, pipe cutting and fit-up, qualified welding, NDE inspections, spool installation, painting and coating, pipe support installation, mechanical walkdowns, field testing, flange cleaning, leak testing, nitrogen purging, reinstatement of equipment, and complete test package documentation.
Electrical & Instrumentation Installation
Our Electrical & Instrumentation (E&I) services cover the complete installation, testing, and commissioning of industrial electrical and control systems. We specialize in cable laying, cable tray and conduit installation, glanding and termination, equipment and panel installation, lighting systems, earthing, cathodic protection, fire alarm systems, instrumentation installation, pneumatic tubing, loop testing, subsystem energization, and functional testing of actuated valves.
Non-Metallic Piping(GRE / RTRP)
We deliver professional installation of GRE and RTRP piping systems following approved engineering and manufacturer procedures. Our services include material verification, site preparation, pipe cutting, joint preparation, adhesive bonding, lamination, mechanical coupling, pipe alignment, curing, support installation, inspection, testing, and backfilling clearance to ensure long-term reliability and corrosion resistance. Every installation is carried out by qualified personnel using proven techniques to maintain structural integrity and operational performance throughout the system’s lifecycle. Our commitment to quality, precision, and compliance ensures durable piping solutions that meet the demanding requirements of industrial and process facilities.
Hydro Testing & Pipeline Integrity
We perform hydrostatic testing to verify the strength, integrity, and leak-tightness of piping systems before commissioning. Our testing process includes test package preparation, line walkdowns, temporary equipment installation, calibrated pressure testing, staged pressurization, leak inspection, acceptance testing, safe depressurization, dewatering, and final drying in accordance with international standards. Each testing activity is conducted using calibrated equipment and controlled procedures to ensure accurate, reliable, and fully documented results. Our experienced team ensures every piping system is validated for safe operation, regulatory compliance, and long-term performance before it is placed into service.
